Pricing & Margins

How to Calculate a Shop Rate That Actually Covers Your Costs

How to calculate a machine shop rate that covers machine, labor and overhead costs, with a worked CNC example, utilization math and work-center rates.

Shop floor supervisor with a clipboard reviewing production on a manufacturing line

Quick answer: Shop rate = (annual machine cost + burdened operator labor + allocated shop overhead) ÷ billable hours, then add your profit margin. Divide by about 75% of paid hours, not 2,080. In the example below, a 3-axis machining center costs $129.51 per billable hour to run. To make a 15% margin, you need to charge $152.37 an hour.

Your shop rate is what a machine or work center costs you for a year, divided by the hours you can actually bill on it. The cost has three parts. There's the cost of owning the machine, the operator with burden, and the machine's share of shop overhead. Then you add the profit you need on top.

The costs are easy to pull from your books. The hours are where shops get it wrong. If you divide by 2,080 paid hours instead of the hours the machine actually does billable work, your rate comes out too low. In the example below, that one mistake makes an hour look like it costs $97 when it really costs $130. You usually don't find out until year-end, when the margin isn't there.

What's the formula for a shop rate?

Shop rate = (machine cost + labor cost + allocated overhead) ÷ billable hours, then add profit

Piece What goes in it Where it goes wrong
Machine cost Depreciation over the machine's real life, financing interest, maintenance, repairs, tooling, power, floor space, software Using tax depreciation, which can make a two-year-old machine look free
Labor cost Operator wages plus payroll taxes, health insurance, retirement match, workers' comp Using the base wage only
Allocated overhead Supervision, quality, programming, shipping, maintenance staff, insurance, rent, office, the owner's market-rate salary Leaving the owner's salary out
Billable hours Hours the machine produces work you can charge for Dividing by 2,080 paid hours
Profit The margin you need on top of cost Adding a markup percentage and calling it margin

Think of your shop rate as a cost number first and a price number second. Once you know what an hour really costs, quoting stops being a guess. You're just deciding how much margin each job should carry.

Step 1: What does the machine cost to own?

Start with what it costs to own and run the machine for a year, whether it's cutting chips or sitting there.

  • Depreciation over its real life. If you expect a machining center to run 10 years, put one-tenth of its cost into each year's rate. That's true even if your CPA wrote off the whole machine for taxes. With 100% bonus depreciation permanently back for property acquired after January 19, 2025, your tax books may show a new machine fully expensed in year one. Don't use that number for costing.
  • Financing. Interest on the equipment loan, or on the line that funded the down payment.
  • Maintenance, repairs and tooling. Use last year's actuals for this machine or this type of machine, not the brochure.
  • Power. It matters more on big machines, ovens, plating lines and lasers. A reasonable estimate is fine.
  • Floor space. Square feet the machine and its work area take up, times your occupancy cost per square foot.
  • Software. CAM seats, probing, monitoring and post-processor licenses tied to the machine.

Step 2: What does the operator really cost?

The hourly wage is just the start. On top of it you pay:

  • 6.2% Social Security on wages up to the 2026 wage base of $184,500
  • 1.45% Medicare on all wages
  • Federal unemployment (FUTA), which works out to 0.6% of the first $7,000 per employee in most states and more in credit-reduction states, plus your state unemployment rate
  • Health insurance, retirement match and workers' comp

Our post on the fully loaded cost of a manufacturing employee goes line by line. The total on top of wages is your labor burden rate.

Handle paid time off and holidays in the hours (Step 4), not by bumping up the wage. You pay for 2,080 hours, but the operator isn't on the floor for all of them.

Step 3: How do you spread shop overhead?

Overhead is everything that keeps the shop running but isn't tied to one machine. That includes:

  • supervisors, quality inspectors, programmers, material handlers and maintenance staff
  • shipping, insurance, and any rent not already charged as floor space
  • the office, your ERP and IT
  • a market-rate salary for the owner or general manager

Add it up for the year and spread it across your work centers using a driver that matches how the shop works. Machine hours usually work for machining and fabrication. Direct labor hours fit assembly-heavy shops better. If the driver doesn't match how your shop actually uses overhead, your rates will be off. Our post on overhead absorption mistakes shows how.

What if you have far more capacity than you use?

Don't charge your jobs for capacity you aren't using. Say you own a 40,000-square-foot building but production only uses about half of it. If the whole building's cost goes into your shop rate, every job pays for 20,000 empty square feet. Your rate comes out too high and you lose bids you should win. Then the space stays empty.

Build your rates on the space, machines and overhead that production actually needs at normal volume. Track the rest separately as the cost of excess capacity. That cost is real, but it's a business decision, not a job cost. You can lease out the extra space, sell or park the idle machine, or go win the work to fill it. The same goes for a machine that sits idle most of the week.

Step 4: How many hours can you really bill?

This is where I'd spend the most time. Start with paid hours and take out everything you can't bill:

Hours One shift, one machine
Paid hours (40 × 52) 2,080
Less holidays and PTO (144)
Available hours 1,936
Less planned maintenance, training and meetings (76)
Scheduled hours 1,860
× Realistic capacity utilization (setup gaps, waiting on material, nothing scheduled) 84%
Billable hours (about 75% of paid hours) 1,562

Use your own numbers for utilization. If you don't track it, compare the hours you billed on jobs last year with the hours you paid operators on that machine. That ratio is a good place to start. What I have found is that billable hours on a single shift land around 75% of paid hours. That's where the 84% in this example comes from.

Worked example: a 3-axis vertical machining center

Here's the full math for one VMC with one operator on one shift. The numbers are made up, so plug in your own.

Cost line Annual amount
Depreciation ($180,000 over 10 years) $18,000
Financing interest $7,000
Maintenance, repairs and tooling $14,000
Power $5,000
Floor space (400 sq ft × $12) $4,800
Software and licenses $2,400
Machine cost $51,200
Operator wages ($30 × 2,080) $62,400
Payroll taxes, benefits, workers' comp $18,700
Labor cost $81,100
Allocated shop overhead $70,000
Total annual cost $202,300

Cost per billable hour = $202,300 ÷ 1,562 = $129.51

That's break-even. Charge less and this machine loses money on every job. To make a 15% margin on the price, divide by 0.85: $129.51 ÷ 0.85 = $152.37 an hour.

Watch the difference between markup and margin here. A 15% markup on cost gets you $148.94, and that's only a 13% margin. Our post on markup vs. margin explains why the two get mixed up in quoting.

Divide by 2,080 paid hours instead and you get $97.26 an hour. Every job gets priced off a number that's about a quarter too low.

How does utilization change the rate?

Utilization Billable hours Cost per hour
70% 1,302 $155.38
84% 1,562 $129.51
90% 1,674 $120.85

Same machine, same costs, and the rate moves $35 an hour. So be careful quoting off a competitor's rate or a survey number. The same rate can make money in a busy year and lose money in a slow one, with nothing else changing.

Should you use one shop rate or several?

One blended rate is easy, but it moves profit around between jobs. A 5-axis machine, a manual lathe and a deburr bench don't cost the same per hour. With one rate, you overprice simple work and lose bids you should win. You also underprice complex work and win bids you should lose.

For a shop in the $3M–$30M range, here's what I'd suggest:

  • Group similar machines into 4–8 work centers, for example 3-axis milling, 5-axis milling, turning, fabrication and welding, finishing, and assembly and inspection.
  • Calculate a rate for each work center with the steps above.
  • Split the machine rate from the labor rate when one operator runs more than one machine. In the example, the machine portion is ($51,200 + $70,000) ÷ 1,562 = $77.59, and the labor portion is $81,100 ÷ 1,562 = $51.92. If one operator runs two machines, each machine hour carries $77.59 + $25.96 = $103.55, not $129.51.
  • Handle setup the same way every time. Either quote it separately or build it into run time, so short runs carry their real cost.

For a CNC or precision machining shop or a metal fabrication shop, moving to work-center rates is one of the biggest improvements you can make to your quoting.

What are the most common shop rate mistakes?

  1. Dividing by paid hours. This is the mistake I see most, and it's the most expensive one.
  2. Raising the rate when work slows down. If you recalculate on low hours, prices go up exactly when you need to win work. Set rates on normal capacity, and treat unused capacity as a cost of that period, not of the jobs you do win.
  3. Charging jobs for capacity you don't use. An empty half of the building or an idle machine shouldn't be in the rate. It prices you out of the work you need to fill it.
  4. Leaving out the owner's salary. If you run a machine or do the programming yourself, that work has a market cost.
  5. Using tax depreciation. Bonus depreciation can make a two-year-old machine look free.
  6. Never checking it. A rate is a forecast. Compare it to your job cost reports every quarter to see whether jobs are earning what the quote assumed.
  7. Confusing cost with price. Your shop rate is your floor. What a customer will pay depends on the work, the relationship and the market, and that's a pricing and margin question.

How often should you update your shop rate?

At least once a year, at budget time, using next year's expected costs and hours, not last year's. Update it mid-year if something big changes, such as:

  • a new machine
  • a raise
  • a second shift
  • a rent increase
  • winning or losing a big customer

And check every quarter that actual billable hours are close to what you assumed. If they're running below, your rate is too low even if nothing else changed.

If you want help building work-center rates from your own books and job data, that's a big part of our manufacturing accounting work. For the cost side, see our guide to calculating labor and overhead cost.

Frequently Asked Questions

What is the average machine shop rate per hour?

There isn't a useful average. Published rates vary a lot by region, equipment and tolerances. They also tell you what other shops charge, not what an hour costs you. Figure out your own cost per billable hour first, then compare it to the market to see where you can compete.

How do I calculate a machine hour rate?

Add up the annual cost of owning and running the machine (depreciation, interest, maintenance, tooling, power, floor space) plus its share of shop overhead, and divide by the hours you expect it to do billable work. Add operator labor separately if one person runs several machines.

What utilization should I assume?

Use your own history. Compare hours billed on jobs to hours paid for operators over the last 12 months. Set the rate on a normal level, not on your best month or your slowest one.

Should the owner's salary be in the shop rate?

Yes. Put a market-rate salary for the owner's role (general manager, programmer, estimator) into overhead. Otherwise the business only looks profitable because the owner works for free.

Is a shop rate the same as a burden rate?

No. A burden rate is what you pay on top of wages: payroll taxes, benefits and insurance. A shop rate is the full cost of an hour of capacity, including burdened labor, the machine and its share of overhead.

More on: Pricing & Margins · Cost Accounting

Keep reading

Related articles

Get a finance partner in your corner

Book a free 30-minute call. We'll talk through your cash, your margins and the decisions ahead, as a partner, not just your accountant.

Book a free call